Location: Industrial Zone, Abou Rawash, Egypt
Area: Total 15,000 m2 built
EG Switchgear: 10,000 m2 built
Headcount: 216 technicians and engineers
65 administration

Switchgear Factory

Our design department includes 17 engineers responsible for preparing all drawings required for the production process. This includes mechanical, electrical, assembly, wiring and drawing for approval.

Planning
Our planning and material departments coordinate their efforts to organize the production process, guarantee the highest possible efficiency and eliminate stoppage time. As soon as the drawings for a project are ready, the planning/material engineers investigate the required components, their availability and lead times. They take action regarding unavailable material, whether local or imported, while the drawings are being approved by the project owner/consultant.

The planning department is also responsible for the flow of production from mechanical to electrical assembly, finishing, inspection and installation.

Home About Products Marketing Factory Contact us

 

2006 © Pure Minds.